This course aims to support you in learning about the basic reliability concept, statistical aspect of reliability and data handling, various failure mechanisms in integrated circuits, and relevant reliability tests.
The knowledge you learnt in this course would enable you to gain a good understanding of reliability and failure mechanisms of integrated circuits, which is required by the microelectronics industries.
Prerequisite graph
Required first
EE3013Semiconductor Devices & ProcessingMS3012Micro/Nanoelectronic Materials ProcessingIc Reliability & Failure Analysis
Unlocks
Available indexes
| Mon | Tue | Wed | Thu | Fri | |
|---|---|---|---|---|---|
| 930 | 34070 TUT (F61) 0930-1020 Fri TR+95 Wk2-13 | ||||
| 1000 | |||||
| 1030 | COMMON LEC (EELE) 1030-1120 Tue TR103 | COMMON LEC (EELE) 1030-1120 Thu TR103 | |||
| 1100 |
Other offerings
Other relevant mods
- EE0005Introduction To Data Science & Artificial Intelligence
- EE1003Introduction To Materials For Electronics
- EE1005From Computational Thinking To Programming
- EE1071Introduction To Eee Laboratories
- EE1102Physics Foundation For Electrical & Electronic Engineering
- EE2001Circuit Analysis
- EE2002Analog Electronics
- EE2003Semiconductor Fundamentals
- EE2005Electrical Devices & Machines
Planning guides
View all articlesSTARS · 9 min read
NTU STARS Guide 2026: Registration Rounds, Bidding & Planner Tips
NTU STARS planner guide — how bidding rounds work, how to prepare a shortlist before registration opens, and what to do when a module fills up. Includes a free STARS planner tool.
Module Planning · 6 min read
NTU Degree Audit: How to Check Your Graduation Requirements
How the NTU degree audit works, where to find it, and how to read it against your programme's core, BDE, UE, and AU requirements before you register for modules.
Module Planning · 6 min read
How to Plan NTU Modules Before STARS Opens: Step-by-Step
Step-by-step guide to planning NTU modules using NTUMods — map degree requirements, build your timetable, check prerequisites, balance workload, and lock in your plan before STARS bidding starts.