The aim of this course is to support you to apply fundamental concepts and theories of the chemical reaction kinetics to design and analyse a variety of reactor systems in the areas of chemical engineering, particularly: Ideal reactors, isothermal and heterogeneous catalytic reactors.
Prerequisite graph
Chemical Reaction Engineering
Available indexes
| Mon | Tue | Wed | Thu | Fri | |||
|---|---|---|---|---|---|---|---|
| 830 | 55060 TUT (C21) 0830-0920 Tue ONLINE, CBE-LT Wk10, Teaching Wk2-9,11-13 | 55061 TUT (C21) 0830-0920 Tue ONLINE, CBE-LT Wk10, Teaching Wk2-9,11-13 | 55062 TUT (B21) 0830-0920 Tue ONLINE, CBE-LT Wk10, Teaching Wk2-9,11-13 | ||||
| 900 | |||||||
| 930 | |||||||
| 1000 | |||||||
| 1030 | COMMON LEC (LE) 1030-1220 Mon ONLINE, CBE-LT Wk10, Teaching Wk1-9,11-13 | ||||||
| 1100 | |||||||
| 1130 | |||||||
| 1200 | |||||||
Other offerings
Other relevant mods
- CH1104Materials & Energy Balances
- CH1802Chemical & Biomolecular Engineering Laboratory 2
- CH2114Heat & Mass Transfer in Chemical & Biological Systems
- CH2123Chemical Thermodynamics
- CH2151Unit Operations: Fluid-Solid Separation
- CH2802Chemical & Biomolecular Engineering Laboratory 2B
- CH4211CNYSP Overseas Final Year Project
- CH4213Pharmacokinetics & Biopharmaceutics
- CH4245Case Studies for Chemical & Biomedical Engineers
Planning guides
View all articlesSTARS · 9 min read
NTU STARS Guide 2026: Registration Rounds, Bidding & Planner Tips
NTU STARS planner guide — how bidding rounds work, how to prepare a shortlist before registration opens, and what to do when a module fills up. Includes a free STARS planner tool.
Module Planning · 6 min read
NTU Degree Audit: How to Check Your Graduation Requirements
How the NTU degree audit works, where to find it, and how to read it against your programme's core, BDE, UE, and AU requirements before you register for modules.
Module Planning · 6 min read
How to Plan NTU Modules Before STARS Opens: Step-by-Step
Step-by-step guide to planning NTU modules using NTUMods — map degree requirements, build your timetable, check prerequisites, balance workload, and lock in your plan before STARS bidding starts.