Historical snapshot — AY2018/2019 Semester 2 · View current offering →
ModsMA4853AY2018/2019 Semester 2
Manufacturing Systems
AY2018/2019 Semester 2
Introduction to Manufacturing Systems, Facility layout design and line balancing, Production planning, Variability, Production scheduling and shop floor control.
| AUs | 3.0 AUs |
| Categories | Core |
| Not Available To Programme | ME(DES)(2011-onwards)(Non Direct Entry), ME(DES)(2012-onwards)(Direct Entry), ME(RMS)(2011-onwards)(Non Direct Entry), ME(RMS)(2012-onwards)(Direct Entry), MEEC(DES)(2011-onwards), MEEC(RMS)(2011-onwards) |
| Exam |
Available Indexes
| Mon | Tue | Wed | Thu | Fri | |
|---|---|---|---|---|---|
| 930 | |||||
| 1000 | |||||
| 1030 | |||||
| 1100 | |||||
| 1130 | |||||
| 1200 | |||||
| 1230 | |||||
| 1300 | |||||
| 1330 | |||||
| 1400 | |||||
| 1430 | |||||
| 1500 | |||||
| 1530 | |||||
| 1600 | |||||
| 1630 | |||||
| 1700 | |||||
| 1730 | |||||
| 1800 |