New: filter modules by day and time, student links, custom courses →
AY2014/2015 Semester 2
Code Title P3.1 Unsymmetric Bending P3.2 Behaviour of Composite Beam P3.3 Stiffness and strength of Irregular-shaped Beam P3.4 Ultimate Load.Of A Beam Under Bending P3.5 Machine Vibration analysis and Fault Recognition P3.6 Vibration Testing.Of Multiple..DOF Systems P3.7 Control Of Vibration P3.8 Vibration Of A 4 Cylinder Engine P3.9 CAD/CAM and CNC P3.10 Plastic Injection Moulding P3.11 Thermo-forming P3.12 Design for manufacture and assembly P3.13 Performance evaluation of milling operations P3.14 Evaluation of surface finish produced by various methods P3.15 Product disassembly P3.16 Design and construction of an analogue PID controller P3.17 Real Time Control & AI Prog of robot beetle P3.18 Motion control of a ball screw system P3.19 A study of servo-hydraulic system P3.20 Liquid level control P3.21 Study of industrial motor characteristics P3.22 Combined heat transfer by free convection and radiation P3.23 Gas Turbine P3.24 Flow over an aerofoil section P3.25 Compressible flow P3.26 Fan Characteristics for differ P3.27 Thermal radiation unit P3.28 Forced convection in tubes P3.29 Convective Heat Transfer P3.30 Film and dropwise condensation E3.1 Dynamic Vibration Absorber E3.2 Vibration of a 2-DOF System E3.3 Computer Modelling, Simulation and Control of an Electromechanical System E3.4 Control Of A Dc Servomotor E3.5 Heat Exchanger E3.6 Transient Heat Conduction
| AUs | 1.0 AUs |
| Categories | Core |
| Not Available To Programme | AERO, ASEC |
| Mutually Exclusive With | MA3072, MP3071, MP3072, MP3073 |
| Exam |
| Mon | Tue | Wed | Thu | Fri | |
|---|---|---|---|---|---|
| 930 | |||||
| 1000 | |||||
| 1030 | |||||
| 1100 | |||||
| 1130 | |||||
| 1200 | |||||
| 1230 | |||||
| 1300 | |||||
| 1330 | |||||
| 1400 | |||||
| 1430 | |||||
| 1500 | |||||
| 1530 | |||||
| 1600 | |||||
| 1630 | |||||
| 1700 | |||||
| 1730 | |||||
| 1800 |
| Mon | Tue | Wed | Thu | Fri | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 930 | 23340 LAB (TA01) 0930-1230 Mon LAB/PROJ | 23341 LAB (TA02) 0930-1230 Mon LAB/PROJ | 23342 LAB (TA03) 0930-1230 Mon LAB/PROJ | 23343 LAB (TA04) 0930-1230 Mon LAB/PROJ | 23344 LAB (TA05) 0930-1230 Mon LAB/PROJ | 23345 LAB (TA06) 0930-1230 Mon LAB/PROJ | 23346 LAB (TB01) 0930-1230 Mon LAB/PROJ | 23347 LAB (TB02) 0930-1230 Mon LAB/PROJ | 23348 LAB (TB03) 0930-1230 Mon LAB/PROJ | 23349 LAB (TB04) 0930-1230 Mon LAB/PROJ | 23350 LAB (TB05) 0930-1230 Mon LAB/PROJ | 23351 LAB (TB06) 0930-1230 Mon LAB/PROJ | 23352 LAB (TC01) 0930-1230 Mon LAB/PROJ | 23353 LAB (TC02) 0930-1230 Mon LAB/PROJ | 23354 LAB (TC03) 0930-1230 Mon LAB/PROJ | 23355 LAB (TC04) 0930-1230 Mon LAB/PROJ | 23356 LAB (TC05) 0930-1230 Mon LAB/PROJ | 23357 LAB (TC06) 0930-1230 Mon LAB/PROJ | 23358 LAB (TD01) 0930-1230 Mon LAB/PROJ | 23359 LAB (TD02) 0930-1230 Mon LAB/PROJ | 23360 LAB (TD03) 0930-1230 Mon LAB/PROJ | 23361 LAB (TD04) 0930-1230 Mon LAB/PROJ | 23362 LAB (TD05) 0930-1230 Mon LAB/PROJ | 23363 LAB (TD06) 0930-1230 Mon LAB/PROJ | 23370 LAB (TF01) 0930-1230 Mon LAB/PROJ | 23373 LAB (TF04) 0930-1230 Mon LAB/PROJ | 23374 LAB (TF05) 0930-1230 Mon LAB/PROJ | 23376 LAB (TG01) 0930-1230 Mon LAB/PROJ | 23377 LAB (TG02) 0930-1230 Mon LAB/PROJ | 23378 LAB (TG03) 0930-1230 Mon LAB/PROJ | 23379 LAB (TG04) 0930-1230 Mon LAB/PROJ | 23380 LAB (TG05) 0930-1230 Mon LAB/PROJ | 23381 LAB (TG06) 0930-1230 Mon LAB/PROJ | 23388 LAB (TJ01) 0930-1230 Mon LAB/PROJ | 23389 LAB (TJ02) 0930-1230 Mon LAB/PROJ | 23390 LAB (TJ03) 0930-1230 Mon LAB/PROJ | 23391 LAB (TJ04) 0930-1230 Mon LAB/PROJ | 23392 LAB (TJ05) 0930-1230 Mon LAB/PROJ | 23394 LAB (TK01) 0930-1230 Mon LAB/PROJ | 23395 LAB (TK02) 0930-1230 Mon LAB/PROJ | 23396 LAB (TK03) 0930-1230 Mon LAB/PROJ | 23397 LAB (TK04) 0930-1230 Mon LAB/PROJ | 23398 LAB (TK05) 0930-1230 Mon LAB/PROJ | 23399 LAB (TK06) 0930-1230 Mon LAB/PROJ | |||||||||||||||||||||||||||||||||||||||||||||||
| 1000 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1030 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1100 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1130 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1200 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1230 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1300 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1330 | 23340 LAB (TA01) 1330-1630 Wed LAB/PROJ | 23341 LAB (TA02) 1330-1630 Wed LAB/PROJ | 23342 LAB (TA03) 1330-1630 Wed LAB/PROJ | 23343 LAB (TA04) 1330-1630 Wed LAB/PROJ | 23344 LAB (TA05) 1330-1630 Wed LAB/PROJ | 23345 LAB (TA06) 1330-1630 Wed LAB/PROJ | 23346 LAB (TB01) 1330-1630 Wed LAB/PROJ | 23347 LAB (TB02) 1330-1630 Wed LAB/PROJ | 23348 LAB (TB03) 1330-1630 Wed LAB/PROJ | 23349 LAB (TB04) 1330-1630 Wed LAB/PROJ | 23350 LAB (TB05) 1330-1630 Wed LAB/PROJ | 23351 LAB (TB06) 1330-1630 Wed LAB/PROJ | 23352 LAB (TC01) 1330-1630 Wed LAB/PROJ | 23353 LAB (TC02) 1330-1630 Wed LAB/PROJ | 23354 LAB (TC03) 1330-1630 Wed LAB/PROJ | 23355 LAB (TC04) 1330-1630 Wed LAB/PROJ | 23356 LAB (TC05) 1330-1630 Wed LAB/PROJ | 23357 LAB (TC06) 1330-1630 Wed LAB/PROJ | 23358 LAB (TD01) 1330-1630 Wed LAB/PROJ | 23359 LAB (TD02) 1330-1630 Wed LAB/PROJ | 23360 LAB (TD03) 1330-1630 Wed LAB/PROJ | 23361 LAB (TD04) 1330-1630 Wed LAB/PROJ | 23362 LAB (TD05) 1330-1630 Wed LAB/PROJ | 23363 LAB (TD06) 1330-1630 Wed LAB/PROJ | 23370 LAB (TF01) 1330-1630 Wed LAB/PROJ | 23373 LAB (TF04) 1330-1630 Wed LAB/PROJ | 23374 LAB (TF05) 1330-1630 Wed LAB/PROJ | 23376 LAB (TG01) 1330-1630 Wed LAB/PROJ | 23377 LAB (TG02) 1330-1630 Wed LAB/PROJ | 23378 LAB (TG03) 1330-1630 Wed LAB/PROJ | 23379 LAB (TG04) 1330-1630 Wed LAB/PROJ | 23380 LAB (TG05) 1330-1630 Wed LAB/PROJ | 23381 LAB (TG06) 1330-1630 Wed LAB/PROJ | 23388 LAB (TJ01) 1330-1630 Wed LAB/PROJ | 23389 LAB (TJ02) 1330-1630 Wed LAB/PROJ | 23390 LAB (TJ03) 1330-1630 Wed LAB/PROJ | 23391 LAB (TJ04) 1330-1630 Wed LAB/PROJ | 23392 LAB (TJ05) 1330-1630 Wed LAB/PROJ | 23394 LAB (TK01) 1330-1630 Wed LAB/PROJ | 23395 LAB (TK02) 1330-1630 Wed LAB/PROJ | 23396 LAB (TK03) 1330-1630 Wed LAB/PROJ | 23397 LAB (TK04) 1330-1630 Wed LAB/PROJ | 23398 LAB (TK05) 1330-1630 Wed LAB/PROJ | 23399 LAB (TK06) 1330-1630 Wed LAB/PROJ | |||||||||||||||||||||||||||||||||||||||||||||||
| 1400 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1430 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1500 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1530 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1600 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1630 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1700 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1730 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1800 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1830 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1900 | 26560 LAB (PLA1) 1900-2200 Wed PROJ/EXP Wk2-13 | 26561 LAB (PLA2) 1900-2200 Wed PROJ/EXP Wk2-13 | 26562 LAB (PLA3) 1900-2200 Wed PROJ/EXP Wk2-13 | 26563 LAB (PLA4) 1900-2200 Wed PROJ/EXP Wk2-13 | 26564 LAB (PLA5) 1900-2200 Wed PROJ/EXP Wk2-13 | 26565 LAB (PLA6) 1900-2200 Wed PROJ/EXP Wk2-13 | 26566 LAB (PLA7) 1900-2200 Wed PROJ/EXP Wk2-13 | 26567 LAB (PLA8) 1900-2200 Wed PROJ/EXP Wk2-13 | 26568 LAB (PLA9) 1900-2200 Wed PROJ/EXP Wk2-13 | 26569 LAB (PLA10) 1900-2200 Wed PROJ/EXP Wk2-13 | 26570 LAB (PLA11) 1900-2200 Wed PROJ/EXP Wk2-13 | 26571 LAB (PLA12) 1900-2200 Wed PROJ/EXP Wk2-13 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1930 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 2000 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 2030 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 2100 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 2130 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||