Excavation Retaining Walls
AY2018/2019 Semester 1
Open and supported excavation: overview of open and braced/anchored excavations in soil, groundwater control, stability of excavations, design of excavation support systems, ground movements associated with excavation, construction monitoring. Earth retaining structures: overview of earth retention systems, concrete retaining walls, reinforced soil walls and anchored bulkheads.
| AUs | 3.0 AUs |
| Categories | Core |
| Mutually Exclusive With | CV4352 |
| Exam |
Available indexes
| Mon | Tue | Wed | Thu | Fri | |
|---|---|---|---|---|---|
| 930 | 28850 TUT (T1) 0930-1030 Mon LT11, LT15 Wk8-13, Teaching Wk1-7 | ||||
| 1000 | |||||
| 1030 | |||||
| 1100 | |||||
| 1130 | COMMON LEC (LEC) 1130-1230 Thu LT15, LT7 Wk1-7, Teaching Wk8-13 | ||||
| 1200 | |||||
| 1230 | |||||
| 1300 | |||||
| 1330 | |||||
| 1400 | |||||
| 1430 | COMMON LEC (LEC) 1430-1530 Thu LT7, LT15 Wk8-12, Teaching Wk1-7 | ||||
| 1500 |