Software Engineering Ii
AY2014/2015 Semester 1
Project Management: project planning, measurement and metrics, cost estimation. Scheduling and tracking, team management, risk analysis, project management tools and techniques. Software Quality Assurance: factors and components. Maintenance: software configuration management, version and change control, documentation. Legacy systems and reverse engineering. Validation and Testing: Strategies and Implementation. Testing tools and plans. Object-oriented testing. Formal verification techniques and introduction to Formal Specification Languages. Capability Maturity Model (CMM) and other standards.
| AUs | 4.0 AUs |
| Categories | Core |
| Not Available As BDE/UE To Programme | ACBS, ACC, ADM, AERO, ASEC, BCE, BEEC, BIE, BMS, BS, BUS, CBE, CBEC, CE, CEE, CEEC, CHEM, CHIN, CS, CSEC, CVEC, ECON, EEE, EEEC, ELH, ENE, ENEC, ENG, IEEC, IEM, LMS, MAT, MATH, ME, ME(DES), ME(MEC), MEEC, MS, MTEC, PHSC, PHY, PSY, SOC |
| Mutually Exclusive With | CZ3002 |
| Exam |
Available Indexes
| Mon | Tue | Wed | Thu | Fri | |
|---|---|---|---|---|---|
| 930 | |||||
| 1000 | |||||
| 1030 | |||||
| 1100 | |||||
| 1130 | |||||
| 1200 | |||||
| 1230 | |||||
| 1300 | |||||
| 1330 | |||||
| 1400 | |||||
| 1430 | |||||
| 1500 | |||||
| 1530 | |||||
| 1600 | |||||
| 1630 | |||||
| 1700 | |||||
| 1730 | |||||
| 1800 |